Implemented projects

CIS PROJECTS

PHARMACEUTICAL FACTORY BIOCAD

  • Saint-Petersburg (Russian Federation)
  • 2018
  • Industrial capacity expansion
  • 20.5 ths. sq.m.
  • 6 chillers with a total performance of 7400 kW,
    40 air handling units

THE BARRACKS OF MOSCOW CREMLIN

  • Moscow (Russian Federation)
  • 2020
  • Outdated equipment replacement
  • 1.2 ths. sq.m.
  • 43 outdoor units for VRF system with the performance of 45 kW each

CONFECTIONERY FACTORY “HLEBPROM”

  • Smolensk (Russian Federation)
  • 2021
  • Extension of capacities
  • 2 ths. sq.m.
  • 27 compression-condensation units with a total performance of 1600 kW

BUSINESS CENTER “KREMLIN PLAZA”

  • Kazan (Tatarstan, Russian Federation)
  • 2020
  • Construction of a new building
  • 1.5 ths. sq.m.
  • 10 VRF system with a total performance of 670 kW

BUSINESS CENTER “CALIBRE”

  • Moscow (Russian Federation)
  • 2019
  • Replacement of the outdated equipment
  • 2.8 ths. sq.m.
  • TASD110.1AC1 screwed chiller with air cooling with a performance of 385 kW

BUSINESS CENTER “BK CAPITAL PALACE”

  • Minsk (the Republic of Belarus)
  • 2019
  • Construction of a new building
  • 23.2 ths. sq.m.
  • The complex of VRF system with a total performance of 2300 kW

PERVOMAISKIY AND SOVETSKIY DISTRICT COURTS

  • Minsk (the Republic of Belarus)
  • 2020
  • Construction of a new building
  • 4 ths. sq.m.
  • 4 VRF system with a total performance of 360 kW

Spinning and weaving building of POLOTSK-STEKLOVOLOKNO JSC

  • Polotsk (the Republic of Belarus)
  • 2021
  • Extension of capacities
  • 2.4 ths. sq.m.
  • 2 chillers with a total perfomance of 3,000 kW

PETRIKOV MINING AND PROCESSING COMPLEX BELARUSKALI JSC

  • Soligorsk (the Republic of Belarus)
  • 2019
  • Construction of a new buiding
  • 1.5 ths. sq.m.
  • 2 VRF system with a total performance of 125 kW

BUILDING №2 OF THE MINISTRY OF DEFENCE OF THE REPUBLIC OF BELARUS

  • Minsk (the Republic of Belarus)
  • 2020 г.
  • Modernization of the building
  • 5.6 ths. sq.m.
  • The outdoor of TIMS140AXA VRF-system with the performance of 40 kW,
    14 TMVW028AB wall-mounted units with the performance of 2.8 kW each,
    2 TMVW036AB wall-mounted units with the performance of 3.6 kW each

PHARMACEUTICAL COMPANY MERRYMED FARM

  • Namangan (Uzbekistan)
  • 2018
  • Replacement of the outadated eqipment
  • 11.6 ths. sq.m.
  • 5 screwed chillers with air cooling with a total performance of 7,855 kW, air handling equipment with a total performance of 99000 cu m/h

SHOPPING MALL ANOR PLAZA SHOPPING CENTER

  • Tashkent (Uzbekistan)
  • 2017
  • Replacement of the outdated equipment
  • 11.5 ths. sq.m.
  • 15 compact air handling units with a total performance of 30,000 cu m/h,
    9 modular chillers with the performance of 130 kW each,
    250 fan coil units

INSULIN PRODUCTION FACTORY ZAMIN BIO HEALTH

  • Andijan (Uzbekistan)
  • 2018
  • Construction of a new building
  • 5 ths. sq.m.
  • 9 modular chiller with the performance of 130 kW each,
    20 sectional air handling units with a total performance of 77,000 cu m/h

AKFA MEDLINE CLINIC

  • Tashkent (Uzbekistan)
  • 2017
  • Replacement of the outdated equipment
  • 8.6 ths. sq.m.
  • 4 chillers with the performance of 450 kW

INFECTIOUS DISEASES HOSPITAL SHOX INTERNATIONAL HOSPITAL

  • Tashkent (Uzbekistan)
  • 2021
  • Construction of a new building
  • 12 ths. sq.m.
  • 148 modular chillers with air cooling with a total performance of 14,120 kW,
    48 air handling units with medical design with a total performance of 186,000 cu m/h

SURGERY CENTER CITIDOCTOR

  • Kiev (Ukraine)
  • 2017
  • Construction of a new building
  • 4.5 ths. sq.m.
  • VRF system with a total performance of 500 kW

SHOX INTERNATIONAL HOSPITAL

  • Tashkent (Uzbekistan)
  • 2018
  • Replacement of the outdated equipment
  • 4 ths. sq.m.
  • 7 modular chillers with the performance of 130 kW each

OVERSEAS PROJECTS

SHOPPING MALL NANJING XINJIEKOU CENTER

  • Nanjing (China)
  • 2019
  • Replacement of the outdated equipment
  • 148 ths. sq.m.
  • 2 oil-free chillers with magnetic bearing centrifugal compressors with a total performance of 17,548 kW

GENESCIENCE PHARMACEUTICALS CO., LTD.

  • Changchun (China)
  • 2020 г.
  • Replacement of the outdated equipment
  • 11 ths. sq.m.
  • Oil-free chiller with magnetic bearing centrifugal compressors with the performance of 4,220 kW

HOSHENSHAN AND LEISHENSHAN HOSPITALS

  • Wuhan (China)
  • 2020
  • Construction of a new building
  • 55 ths. sq.m.
  • 14 central air handling units with a total performance of 105,000 cu m/h,
    VRF system with a total performance of 1,850 kW

CROSS-BORDER ELECTRONIC TRADE INDUSTRIAL PARK

  • Xuchang city (China)
  • 2018
  • Construction of a new building
  • 200 ths. sq.m.
  • 4 geothermal heat pumps with the performance of 1300 kW each, centrifugal chiller with flooded evaporator with the performance of 3000 kW, 500 channel low noise medium pressure fan coil units

PAINT SHOP AT GEELY AUTO PARTS PLANT

  • Yiwu (China)
  • 2017
  • Replacement of the outdated equipment
  • 9 ths. sq.m.
  • 8 sectional air handling units with the performance of 100,000 cu m/h each
    10 sectional air handling units with the performance of 80,000 cu m/h each

INTERNATIONAL EXHIBIT CENTER WUXI-TAIHU INTERNATIONAL EXPO CENTER

  • Wuxi (China)
  • 2016
  • Construction of a new building
  • 148 ths. sq.m.
  • 56 sectional ait handling units with the performance of 120,000 cu m/h each

BUSINESS CENTER ALEXANDRA POINT

  • Singapore
  • 2016
  • Replacement of the outdated equipment
  • 18,6 ths sq.m.
  • 2 oil-free chillers with magnetic bearing centrifugal compressors with a total performance of 3,869 kW

4 STAR HARD ROCK HOTEL

  • Penang State (Malaysia)
  • 2008
  • Construction of a new building
  • 32.5 ths. sq.m.
  • Air handling unit with a total performance of 548,000 cu m/h,
    air-conditioning and cooling systems with a total performance of 3,126 kW

5 STAR RESORT HOTEL CONRAD BALI

  • Bali island (Indonesia)
  • 2020
  • Replacement of the outdated equipment
  • 30 ths sq.m.
  • 6 sectional air handling units with the performance of 100,000 cu m/h each,
    361 various fan coil units (channel average and high pressure, with centrifugal air flow distribution)

AIRPORT FOR HYDRO AIRPLANES

  • Tangerang (Maldives)
  • 2020
  • Construction of a new building
  • 2.5 ths. sq.m.
  • 4 screwed chillers with TWSF0324.2DC1 flooded evaporator with the performance of 1,103 kW each,
    modular air handling units,
    250 cassette fan coil units with circular air distribution with the performance of 10.8 kW each

SM CITY SHOPPING MALL

  • Dasmarinhas (Philippines)
  • 2007
  • Construction of a new building
  • 46.2 ths. sq.m.
  • Air handling equipment with a total performance of 153,000 cu m/h
    air-conditioning and cooling systems with a total performance of 896 kW

BEIJING 2022 WINTER OLYMPICS VENUES

OLYMPIC VILLAGE IN ZHANGJIAKOU

SKI JUMPIMG CENTER “GUYANSHU”

XIAOHAITUO BOBSLEIGH AND LUGE TRACK

CURLING CENTER «WATER CUBE»

Санно-бобслейная трасса
Пекинский национальный плавательный комплекс (Водяной куб)

WUKESONG SPORTS CENTRE

NATIONAL SPEED SKATING OVAL